Post Offer Free
Zulin Formwork & Scaffolding Co., Ltd.  

Gold Index: 1241

You are here: home  > Automatic Climbing Formwork For Wangjing SOHO center T3 Project , Tower Formwork

Automatic Climbing Formwork For Wangjing SOHO center T3 Project , Tower Formwork 

Place of Origin: Beijing, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: Auto-climbing Formwork

Automatic Climbing Formwork For Wangjing SOHO center T3 Project , Tower Formwork
 
Introduction</st

Automatic Climbing Formwork For Wangjing SOHO center T3 Project , Tower Formwork

 

Introduction

 

The lifting power of Auto-climbing Formwork System ZPM-100 comes from the hydraulic system, which includes the oil cylinder and commutator. The steel rail and the bracket can climb alternately, and therefore the whole formwork system climbs steadily. Cranes are not needed during the construction. It’s easy to operate,highly active and safe. It’s the best choice for construction of high buildings and towers.

 

 

ZPM-100  Structure Sketch

 

 Auto Self Climbing Formwork (ZPM-100) for high buildings and towers

 

The Characteristics


1 The system is able to climb as a whole or individually, and in a stable way.
2 As the system climbs by itself and cleaning work is done in situ,  tower crane lifts are greatly reduced.
3 It’s safe and convenient to operate, and labor and material costs will be greatly slashed. 
4 The bracket will not come back to the ground until the construction is finished. Field spacing will be reduced and

 the bumping damages can be almost prevented, especially for the panels.
5 The climbing process is steady, synchronous and safe.
6 All-purpose platforms are provided, and there is no need to set up additional operation platforms, which means 

saving the labor and material costs again.
7 There is little margin for error. And if there is, it is simple and easy to correct. Deviations of construction work can 

be eliminated floor by floor.  
8  Fast climbing speed can be achieved, and the construction cycle will be maintained according to schedule. 

Project: Wangjing SOHO center T3 project(Beijing,China)
Contractor: China Constuction First group Construction & Development Co;Ltd.

Product Type: Auto-climbing Formwork

bigPhoto
 Mr. Mr. Andy Liang

Tel: 86-10-69407048
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

Zulin Formwork & Scaffolding Co., Ltd. [China (Mainland)]


Business Type:Manufacturer
City: Beijing
Province/State: Beijing
Country/Region: China (Mainland)

You May Like:

Product (28)