Post Offer Free
Zulin Formwork & Scaffolding Co., Ltd.  

Gold Index: 1236

You are here: home  > Construction Auto Climbing Hydraulic Formwork System for Western Financial Center

Construction Auto Climbing Hydraulic Formwork System for Western Financial Center 

Place of Origin: Beijing, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: Auto-climbing Formwork

Construction Auto Climbing Hydraulic Formwork System for Western Financial Center
 
 


Construction Auto Climbing Hydraulic Formwork System for Western Financial Center

 

 

Introduction

The lifting power of Auto-climbing Formwork System ZPM-100 comes from the hydraulic system, which includes the oil cylinder and commutator. The steel rail and the bracket can climb alternately, and therefore the whole formwork system climbs steadily. Cranes are not needed during the construction. It’s easy to operate,highly active and safe. It’s the best choice for construction of high buildings and towers.

 

 

ZPM-100  Structure Sketch

 

 Auto Self Climbing Formwork (ZPM-100) for high buildings and towers

 

The Characteristics


1 The system is able to climb as a whole or individually, and in a stable way.
2 As the system climbs by itself and cleaning work is done in situ,  tower crane lifts are greatly reduced.
3 It’s safe and convenient to operate, and labor and material costs will be greatly slashed. 
4 The bracket will not come back to the ground until the construction is finished. Field spacing will be reduced and

 the bumping damages can be almost prevented, especially for the panels.
5 The climbing process is steady, synchronous and safe.
6 All-purpose platforms are provided, and there is no need to set up additional operation platforms, which means 

saving the labor and material costs again.
7 There is little margin for error. And if there is, it is simple and easy to correct. Deviations of construction work can 

be eliminated floor by floor.  
8  Fast climbing speed can be achieved, and the construction cycle will be maintained according to schedule. 

 

Project name: Western Financial Center( 141m)           
Product: Protection panel PS50
Construction unit:
The Third Construction Engineering Company Ltd. of China Construction Second Engineering Bureau( in 2012 )

 

bigPhoto
 Mr. Mr. Andy Liang

Tel: 86-10-69407048
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

Zulin Formwork & Scaffolding Co., Ltd. [China (Mainland)]


Business Type:Manufacturer
City: Beijing
Province/State: Beijing
Country/Region: China (Mainland)

You May Like:

Product (28)